Bangor Hydro makes its facility interconnection requirements for attachment to its Bulk Electric System assets available to the public per the North American Electric Reliability Corporation (NERC) Reliability Standard FAC-001-1. A link to download an interconnection requirements document is provided below. The table found in this document lists the various National, Regional, State and Company interconnection requirements specific to generators, transmission and end-users seeking to attach to bulk electric system assets owned by Bangor Hydro Electric Company.

Interested parties who wish to interconnect to Bangor Hydro should contact:

Kendra Overlock, Manager of Transmission Development
PO Box 932
Bangor, Maine 04402-0932
(207) 973-2895
Email to Kendra Overlock

Click here to download the Facility Interconnection Requirements document.