Bangor Hydro makes its local transmission system plan available to the public per the Federal Energy Regulatory Commission (FERC) Order 890. The table provided at this link lists various system needs as well as proposed solutions. Interested parties who wish to provide written comments for Bangor Hydro's consideration should contact:

Kendra Overlock, Manager of Transmission Development
PO Box 932
Bangor, Maine
04402-0932
(207) 973-2895
Email to Kendra Overlock

Download the Local Transmission System Plan Transmission Planning

Follow Bangor Hydro on TwitterOnline Theft Reporting Bangor Hydro Outages RSS feed