Bangor Hydro makes its local transmission system plan available to the public per the Federal Energy Regulatory Commission (FERC) Order 890. The table provided at this link lists various system needs as well as proposed solutions. Interested parties who wish to provide written comments for Bangor Hydro's consideration should contact:
Kendra Overlock, Manager of Transmission Development PO Box 932 Bangor, Maine 04402-0932 (207) 973-2895 Email to Kendra Overlock
Download the Local Transmission System Plan Transmission Planning